









new-product-page
What's new
1/200 Space Shuttle Enterprise Edward Air Base 1977
in Collectibles sold by Hobbyco
$219.99
Description and specs
The U.S. Space Shuttle program started with the awarding of the contract to Rockwell International's Space Transportation Systems Division. There were 6 shuttles built, Enterprise OV- 101 (Orbital Vehicle) for testing, Columbia OV-102, Challenger OV-099, Discovery OV-103, Atlantis OV-104 and Endeavour OV-105. The first of 135 Space Shuttle missions took place April 12, 1981 and lasted 2 days 6 hours when STS-1 (Space Transportation System) was launched using Space Shuttle Columbia. Of the 135 mission launches there were 2 tragedies when Columbia and Challenger plus their crews were lost.
- Weight (with three shuttle main engines) : 151,315 lb (69 t)
- Dimensions
- Assembled Space Shuttle: 184 ft (56.08 m)
- Orbiter Length: 122.17 ft (37.2 m)
- Height: 56.58 ft (17.25 m)
- Wingspan: 78.06 ft (23.79 m)
- Wings Only: 60 ft (18.3 m)
- Vertical stabilizer: 26.31 ft (8.01 m)
- Payload Bay Doors
- Length: 60 ft (18.3 m)
- Width: 17 ft (5.2 m)
- Height: 13 ft (4.0 m)
- Weight (varies depending on payload and other factors)
- Lift Off: 4,500,000 lb (2,041,166 kg)
- Speed: 17,321 mph (27,875 km/h)
- Orbit Altitude Depending On Mission: Between 115 miles to 400 miles (185 km to 643.7 km)
Delivery and returns
$9.90 shipping nationwide
More specials from this store
View more